Logo
lv en

Results

A (preparatory) actions

C (content) actions

D (monitoring) actions

E (publicity) actions

F (project management) actions

2025

Planned

27.02.2025

Standardised annex to public procurement contract

Responsible partner

Activity C2 "Development of tools and piloting circularity solutions for construction process and material flows".

28.02.2025

Analysis laboratory reports for end-product applications (the demo road section of 1 square meter, demo extrusion and compression moulding end-products)

Responsible partner

Activity C3 "Pilot projects for application of end of waste criteria to demonstrate circularity and waste to resources concept".

02.03.2025

Assessment report on environmental tax rates for non-recyclable materials

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

02.03.2025

Assessment report on efficiency of environmental tax

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

02.03.2025

Assessment report on application of the PAYT scheme

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

30.04.2025

Report on mapping of material flows and side-streams in the region

Responsible partner

Activity C5 "Establishment of industrial symbiosis platform for waste".

30.06.2025

Report on IS platform launching activities and results

Responsible partner

Activity C5 "Establishment of industrial symbiosis platform for waste".

30.06.2025

Annual reports on statistic data on secondary use of good and repair

Responsible partner

Activity C7 "Creating ecosystem for encouraging re-use, repair, and upcycling activities".

30.09.2025

Report on implementation on 1st and 2nd phase IS pilots in the region

Responsible partner

Activity C5 "Establishment of industrial symbiosis platform for waste".

30.09.2025

Interim extract of the project data from the KPI webtool

Responsible partner

Activity D4 "Monitoring of LIFE Key project level indicators (online dynamic indicator database)".

30.10.2025

Report on pilot technology effectiveness at regional landfill “Daibe“

Responsible partner

Activity C4 "Pilot projects in regional landfills for improvement of waste sorting with aim of material and energy recovery".

30.11.2025

Datasets for local municipalities and national/international institutions on marine litter accordingly internationally approved methodology

Responsible partner

Activity C9 "Educational and behaviour change demonstration activities for waste prevention, sustainable consumption and circular thinking".

31.12.2025

Training materials for enhancing industrial symbiosis (C5)

Responsible partner

Activity E1 Project visibility and dissemination of project results.

31.12.2025

Summary impact report on effectiveness of education and awareness events in the territories based on monitoring data on littering and waste measurements

Responsible partner

Activity C9 "Educational and behaviour change demonstration activities for waste prevention, sustainable consumption and circular thinking".

31.12.2025

Report on situation assessment and development analysis for sub activities and pilot projects

Responsible partner

Activity C1 "Development and demonstration of a complex approach to separate waste collection system".

31.12.2025

Report on results from educational forums and hackathons for pupils

Responsible partner

Activity C9 "Educational and behaviour change demonstration activities for waste prevention, sustainable consumption and circular thinking".

31.12.2025

Report on implementation of teachers training and Training of Trainers programmes

Responsible partner

Activity C9 "Educational and behaviour change demonstration activities for waste prevention, sustainable consumption and circular thinking".

31.12.2025

Report on food waste generation in Latvia in 2024

Responsible partner

Activity C8 "Demonstration of solutions for reduction of biological and food waste and improving food waste measurements".

31.12.2025

Report on built infrastructure and awareness activities in 2 pilot municipalities for tobacco litter reduction

Responsible partner

Activity C9 "Educational and behaviour change demonstration activities for waste prevention, sustainable consumption and circular thinking".

31.12.2025

Report on barriers and possibilities for implementation of reuse and repair scheme in Latvia

Responsible partner

Activity C7 "Creating ecosystem for encouraging re-use, repair, and upcycling activities".

31.12.2025

Report on a unified standardised IT solution description or EPR registers, consisting of technical description of procedures and software

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

31.12.2025

Recommendations for specifying circularity requirements in the Green public procurement

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

31.12.2025

Recommendations for establishment of “Compost Register” at municipal level

Responsible partner

Activity C8 "Demonstration of solutions for reduction of biological and food waste and improving food waste measurements".

31.12.2025

Recommendations (methodology) for accounting and integration of biological waste recycling results from home-composting

Responsible partner

Activity C8 "Demonstration of solutions for reduction of biological and food waste and improving food waste measurements".

31.12.2025

Interim monitoring report on coastal ES assessment on impacts on coastal areas and landfill repurposing sites

Responsible partner

Activity D2 "Monitoring of the impacts of the Project actions of ecosystem services".

31.12.2025

Full report on platform model design (after 2nd phase of its update and extension)

Responsible partner

Activity C7 "Creating ecosystem for encouraging re-use, repair, and upcycling activities".

31.12.2025

Assessment report on the overall tax regime in Latvia affecting transition to secondary markets

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

31.12.2025

Analysis and evaluation of socio-economic and environmental benefits of the implemented Phase 1 pilot projects

Responsible partner

Activity C1 "Development and demonstration of a complex approach to separate waste collection system".

31.12.2025

A summary of the results of laboratory research for the period 2022-2024 and recommendations for differentiating environmental tax rates according to recyclable / non-recyclable, recoverable, disposable

Responsible partner

Activity C10 "Development of laboratory tests and policy recommendations for transition to plastic pollution free society".

Done

17.02.2025

Report on an operational scheme for local – close to the biological waste producer – management of bio-waste based on pilot experience

Responsible partner

Activity C8 "Demonstration of solutions for reduction of biological and food waste and improving food waste measurements".

annex-c8d1_wmal_report-on-an-operational-scheme_final.pdf

1.75 MB