Logo
lv en

Results

A (preparatory) actions

C (content) actions

D (monitoring) actions

E (publicity) actions

F (project management) actions

2024

Planned

30.06.2024

Report on an operational scheme for local – close to the biological waste producer – management of bio-waste based on pilot experience

Responsible partner

Activity C8 "Demonstration of solutions for reduction of biological and food waste and improving food waste measurements".

30.06.2024

Created CO2 reduction algorithm (report)

Responsible partner

Activity C2 "Development of tools and piloting circularity solutions for construction process and material flows".

30.06.2024

Assessment report on application of the PAYT scheme

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

31.08.2024

Policy recommendation for application of end of waste criteria

Responsible partner

Activity C3 "Pilot projects for application of end of waste criteria to demonstrate circularity and waste to resources concept".

30.09.2024

Standardised annex to public procurement contract

Responsible partner

Activity C2 "Development of tools and piloting circularity solutions for construction process and material flows".

30.09.2024

Report on mapping of material flows and side-streams in the region

Responsible partner

Activity C5 "Establishment of industrial symbiosis platform for waste".

29.11.2024

Report on IS platform launching activities and results

Responsible partner

Activity C5 "Establishment of industrial symbiosis platform for waste".

31.12.2024

Report on built infrastructure and awareness activities in 2 pilot municipalities for tobacco litter reduction

Responsible partner

Activity C9 "Educational and behaviour change demonstration activities for waste prevention, sustainable consumption and circular thinking".

31.12.2024

Methodology for accounting greenhouse gas emissions

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

31.12.2024

Assessment report on efficiency of environmental tax

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

31.12.2024

A comprehensive set of informative materials and communication tools for manufacturing entrepreneurs (C10)

Responsible partner

Activity E1 Project visibility and dissemination of project results.

Done

31.01.2024

Strategy for Dialogue with Science

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

annex-c6d11_meprd_strategija-dialogam-ar-zinatni.pdf

443.42 KB

31.01.2024

Recommendations for the most optimal model of application of EPR scheme in Latvia

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

annex-c6d10_green-belt_recommendations-for-the-most-optimal-model-of-application-of-epr-scheme-in-latvia.pdf

745.27 KB

29.02.2024

Guidelines for waste sorting at construction site during demolition and new construction

Responsible partner

Activity C2 "Development of tools and piloting circularity solutions for construction process and material flows".

annex-c2d1_lba_guidelines-for-waste-sorting-at-construction-site-during-demolition-and-new-construction.pdf

4.06 MB

28.03.2024

Initial monitoring report

Responsible partner

Activity D1 "Monitoring of the impact of the Project results and methods demonstrated"

d1_meprd_initial-monitoring-report_eng-publicesanai.pdf

4.69 MB

15.04.2024

Report on designed operational model (incl. financial model) for local repair and upcycling centres establishment and operations in Cēsis and Valmiera municipalities

Responsible partner

Activity C7 "Creating ecosystem for encouraging re-use, repair, and upcycling activities".

annex-c7d1_cm_report-on-designed-operational-model-for-repair-in-cesis_part-ii.pdf

432.21 KB

annex-c7d1_zaao_report-on-designed-operational-model-for-repair-in-valmiera_part-i.pdf

1.96 MB

17.06.2024

Research report on the plastics on the LV market

Responsible partner

Activity C10 "Development of laboratory tests and policy recommendations for transition to plastic pollution free society".

annex-c10d1_lgt_research-report-on-the-plastics-on-the-lv-market_geo-consultants_eng.pdf

1.34 MB

annex-c10d1_lgt_research-report-on-the-plastics-on-the-lv-market_geo-consultants_lv.pdf

1.39 MB

annex-c10d1_lgt_research-report-on-the-plastics-on-the-lv-market_lbtu_eng.pdf

3.67 MB

annex-c10d1_lgt_research-report-on-the-plastics-on-the-lv-market_lbtu_lv.pdf

3.83 MB

30.06.2024

Guidelines for waste management and sorting facilities

Responsible partner

Activity C2 "Development of tools and piloting circularity solutions for construction process and material flows".

annex-c2d3_cleanr_guidelines-for-waste-management-and-sorting-facilities.pdf

1.95 MB

05.09.2024

Initial monitoring report on coastal Ecosystem Services assessment on impacts on coastal areas and landfill repurposing sites

Responsible partner

Activity D2 "Monitoring of the impacts of the Project actions of ecosystem services".

annex-d2d2_baltic-coasts_initial-monitoring-report-on-es-assessment-on-impacts-on-coastal-areas-and-landfill-repurposing-sites.pdf

1.92 MB

18.09.2024

Circular Economy Roadmap

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

aprites-ekonomikas-cela-karte_24.09.2024.pdf

65.98 MB